Levee Gate Modifications

The construction of a new levee gate access and operation platform, including footings, steel, welding, operator(s), installation of Owner supplied gate(s), painting and all necessary appurtenances to successfully complete the project

Water Mark Logo

2022 Water Treatment Plant Upgrades

The installation of a rapid mixer and new finished water pumps and the construction of a proposed chemical feed building at the Talladega Water Treatment Plant and all necessary appurtenances to successfully complete the project.

Water Mark Logo

Alabaster Fire Station No. 2 Expansion

Work that includes a new stand alone metal building, insulation, roll up doors, walk doors, storage room and restroom, including concrete, electrical, plumbing, HVAC, and all associated appurtenances for The City of Alabaster Station No. 2 Expansion

Water Mark Logo

City Hall Sewer Replacement Phase 2

The removal and re-installation of two 6 inch service laterals that run from the nearest outside manhole through the building to furthermost fixtures. Installation shall include floor removal, connections, backfill and all necessary appurtenances to successfully complete the project

Water Mark Logo

Burwell Trunk Sewer Replacement

The construction of 24” PVC gravity sanitary sewer line, 30” PVC gravity sanitary sewer line, dry jack and bore crossings of 24” gravity sewer line with 36” steel casings, manholes, manhole frames and covers, CIPP lining of existing sanitary sewer line, existing sanitary manhole and sanitary sewer line removal, connection to existing sanitary sewer system, erosion control, traffic control, all associated appurtenances,

Water Mark Logo

Courtland Water System Replacement Phase 2 Materials Only Bid

Materials Bid Only: This includes furnishing approximately 5,300 L.F. of 8” CL. 200 PVC water lines; D.I. fittings, valves, and valve markers; water service line; 10” HDPE; and all necessary appurtenances in the downtown area of Courtland, Alabama, 35618