Water Mark Logo

Morris Fire Station Expansion

The expansion will include footings, concrete slab, building construction, and misc. other items as required to expand the current fire station.

Water Mark Logo

Water Meter Replacement

The replacement of approximately 4,079 Water Meters, water service line replacement, software, and multiple handheld devices for the project, and all necessary appurtenances to complete the project.

Water Mark Logo

Champion Road Booster Pump Station

The construction of a new water booster pump station, water piping, valves, the demolition of an existing water booster station, asphalt driveway repair, concrete driveway repair, fencing, and all other necessary water line appurtenances.

Water Mark Logo

Bruce Hamler Reverse Osmosis Water Treatment Facility – CMAR PROCUREMENT

On behalf of the Owner, InSite Engineering LLC will act as the sole point of contact for this RFP and shall administer the RFP process. All communications shall be submitted in writing, or by email, and shall specifically reference this RFP. All questions or comments should be directed to the Owner contact as follows: Bryan K. Pate, P.E. InSite Engineering, LLC 5800 Feldspar Way, Hoover, AL 35244 Office 205-985-2101; Cell 205-966-883 bryan@insiteengineering.org

Water Mark Logo

2022 Brecon WWTP Filter Addition

Construction of a cloth media disk filter, filter structure, piping, valves, modifications to the chlorine contact chamber, controls, sludge pumps at the Brecon WWTP and all necessary appurtenances to successfully complete the project

Water Mark Logo

2022 Airport WWTP Filter Addition

Construction of a cloth media disk filter, filter structure, piping, valves, modifications to the chlorine contact chamber, controls, sludge pumps at the Airport WWTP and all necessary appurtenances to successfully complete the project

Water Mark Logo

Alabaster Boulevard Pavement Remediation

The furnishing and installation of all necessary materials, labor, and other appurtenances on Alabaster Boulevard in the City of Alabaster, Alabama. This work shall include the full depth replacement of portions of the roadway, installation of edge drains and cross drains, milling repair, curb and gutter replacement, striping replacement, and other associated items

Water Mark Logo

WWTP Lagoon Sludge Removal

Dewatering and removal of approximately 2,000,000+/- gallons of sludge (sludge must be disposed of in accordance with all Federal, State, and Local regulations and guidelines), erosion control, and all necessary appurtenances to successfully complete the project.