CORDOVA RESURFACING AND PAVING PHASE 1

Work to complete installation of asphalt overlay at multiple locations throughout the City of Cordova,
Alabama. This work shall include the full depth replacement of portions of the roadways, milling repair,
curb and gutter replacement, sidewalk repair, and other associated appurtenances. 6,700 tons of Wearing surface installation, 24,000 square yards of roadway patching, 17,000 square yards of planing of existing pavement, associated leveling as required to establish cross slope and other associated appurtenances.

Water Mark Logo

DAM ROAD REMEDIATION

Remediation construction to an existing dam access road in Talladega, Alabama. This project
includes approximately six (6) acres of clearing, grubbing, and tree/brush removal, the
remediation and finishing of approximately 12,100 LF of existing gravel access road,
approximately 260 LF of a 6’ wide access path, rip-rap and fabric, gravel road covering, erosion
control, and all other necessary appurtenances.

Water Mark Logo

2024 CDBG Project – Skyline Drive Widening

Project for the widening of 900 linear feet of Skyline Drive. This includes the full depth asphalt buildup of the widening areas, overlay, curb, gutter, erosion control, and all other items incidental to and required for the completion of work in Hayden, Alabama 35079. This is a CDBG Project.

Water Mark Logo

2025 Roadway Paving Improvements

The furnishing and installation of a base bid amount of approximately 5600 tons of asphalt overlay, and an alternate amount of an additional approximate 2200 tons of asphalt overlay at multiple locations throughout the City of Alabaster, Alabama. This work shall include the full depth replacement of portions of the roadways, milling repair, curb and gutter replacement and other associated appurtenances.