The rehabilitation and upgrade to an existing sanitary sewer pumping station, including submersible pumps, wet wells lining, replacement of piping, replacement of valves, and all necessary appurtenances in
Hoover, Alabama 35216.

The rehabilitation and upgrade to an existing sanitary sewer pumping station, including submersible pumps, wet wells lining, replacement of piping, replacement of valves, and all necessary appurtenances in
Hoover, Alabama 35216.
The construction of 24” PVC gravity sanitary sewer line, 30” PVC gravity sanitary sewer line, dry jack and bore crossings of 24” gravity sewer line with 36” steel casings, manholes, manhole frames and covers, CIPP lining of existing sanitary sewer line, existing sanitary manhole and sanitary sewer line removal, connection to existing sanitary sewer system, erosion control, traffic control, and all associated appurtenances.
Installation of a wastewater outfall diffuser on Mobile River at Lenzing Fibers, Inc. Axis, AL.
The furnishing and installation of a base bid amount of approximately 5600 tons of asphalt overlay, and an alternate amount of an additional approximate 2200 tons of asphalt overlay at multiple locations throughout the City of Alabaster, Alabama. This work shall include the full depth replacement of portions of the roadways, milling repair, curb and gutter replacement and other associated appurtenances.
Contract #2 of Carrollton DRA Sewer System Upgrades Project to include sewer line and storm sewer pipe video inspection, cleaning, de-rooting, and cured-in-place pipe lining (CIPP). Project to also include manhole structure cleaning, cured-in-place-manhole lining (CIPMH), and manhole riser sections.
Install cured-in-place liners, rehabilitate or replace manholes, and reconnect service lines as detailed on the plans.