The rehabilitation and upgrade to an existing sanitary sewer pumping station, including submersible pumps, wet wells lining, replacement of piping, replacement of valves, and all necessary appurtenances in
Hoover, Alabama 35216.

The rehabilitation and upgrade to an existing sanitary sewer pumping station, including submersible pumps, wet wells lining, replacement of piping, replacement of valves, and all necessary appurtenances in
Hoover, Alabama 35216.
Work to complete installation of asphalt overlay at multiple locations throughout the City of Cordova,
Alabama. This work shall include the full depth replacement of portions of the roadways, milling repair,
curb and gutter replacement, sidewalk repair, and other associated appurtenances. 6,700 tons of Wearing surface installation, 24,000 square yards of roadway patching, 17,000 square yards of planing of existing pavement, associated leveling as required to establish cross slope and other associated appurtenances.
Furnishing and installation of an Advanced Metering Infrastructure System all necessary and incidental work to the operation i.e. 2,381 +/- water meters, 960+/- gas meter registers, hardware and software setup, training and installation, curb stop replacements as required, service line replacement as required.
Work of the Project includes the removal and replacement of existing 2”, 6”, and 8” gate valves, the
removal and replacement of 2” tapping valves and sleeves, and the removal and replacement of 1”
and 2” water meters within the Town of Carrollton’s drinking water distribution system. The Project work also includes the installation of new 2”, 6”, and 8” gate valves, the installation of new 6” and 8” insertion valves, the installation of new 6” fire hydrant gate valves, the installation of new fire hydrant assemblies, related components, and all necessary appurtenances as seen in the project plans and specifications.
The furnishing and installation of a base bid amount of approximately 5600 tons of asphalt overlay, and an alternate amount of an additional approximate 2200 tons of asphalt overlay at multiple locations throughout the City of Alabaster, Alabama. This work shall include the full depth replacement of portions of the roadways, milling repair, curb and gutter replacement and other associated appurtenances.