New Water Storage Tank

The replacement of approximately 100 linear feet of 12” class 350 ductile iron water line,
connection to the existing water system, gravel pavement installation, demolition of existing
water storage tanks, construction of a water storage tank, electrical work, earthwork, erosion
control, and all necessary appurtenances.

Water Mark Logo

Brecon WWTP Equipment Upgrades

This project includes replacement of two blowers, transducers, D.O Probes, Disinfection Equipment and all other necessary equipment upgrades

Water Mark Logo

Linden Water System Improvements – Waterline

Work of the Project includes construction of a proposed water transmission main, up to
approximately 16,000 +/- L.F. of 8” PVC water line, bore crossings, valves, air release valves,
connection to systems, and all necessary appurtenances in Linden, Alabama 36748, for a
Stipulated Price contract, according to Contract Documents. Perform Work of Contract under
stipulated sum/price Contract with Owner according to Conditions of Contract.

Water Mark Logo

Tower Tank Booster Pump Station

The installation of a new duplex package booster pump station, connections to existing distribution system, a diesel-driven backup generator, related site, mechanical and electrical work, and all necessary appurtenances.

Water Mark Logo

Love Branch WWTP

Construction of the proposed Love Branch Wastewater Treatment Plant including pumping stations, a screening structure, new sequential batch reactor basins, a post equalization basin, ultraviolet disinfection, cascade aeration, and other appurtenances to include a plant SCADA system, fencing, building construction, site lighting, paving, and other similar work and all associated appurtenances.

Water Mark Logo

Ashland Park

The construction of a new splash pad, fitness workout area, amphitheater, parking lot, sidewalks, landscaping, electrical, water service, demolition and all necessary appurtenances in Ashland, Alabama 36521

Water Mark Logo

Town of Millport DWSRF Water Storage Tank

Construction of a 140,000-gallon water storage standpipe at the intersection of Watertank Road and Chandler Street in Millport, AL, including all site improvement items as shown in the plans and specifications.

Water Mark Logo

City of Reform DWSRF Water Storage Tank

Construction of a 500,000-gallon ground water storage tank at 643 9th Ave NW, Reform, AL including all site improvement items as shown in the plans and specifications.

Water Mark Logo

U.S. 431 Waterline Relocation

The installation of approximately 2,280 linear feet of 12” PVC water main and associated fittings installed by open cut, one 16” HDPE Creek Crossing installed by direction drill, 2-12” ductile iron gate valves, connection to existing water main at each end of project, and all necessary appurtenances.