Water Mark Logo

South West Water Main Loop Phase No. 1

A proposed water transmission main, approximately 2,700 +/- L.F. of
20” HDPE water line, 140 +/- L.F. of 16” CL 51 Ductile Iron water line, valves, air release
valves, connection to systems and all necessary appurtenances in Calera, Alabama 35040.

Water Mark Logo

ALDOT Utility Relocation Hwy 119 and Shephard Branch Bridge

Approximately 2,100 linear feet of 8” Ductile Iron water main installed by open cut with 54 linear feet of steel casing, approximately 100 linear feet of 8” ductile iron water main with steel casing installed by direct jack and bore, approximately 250 linear feet of DR11 10” HDPE installed by direction drill, 40 linear feet of 4” ductile iron water main installed by open cut, 16 linear feet of 4” ductile iron water main in 12” steel casing installed by jack and bore, three 8” gate valves, one 6” gate valve, one 4” gate valve, approximately 1,500 pounds of ductile iron fittings, one fire hydrant and assembly, and connection to existing water main, required erosion and sediment control, and all necessary appurtenances

Water Mark Logo

SOUTHWEST WATER MAIN LOOP PHASE NO. 1B

A proposed water transmission main including base bid and alternates, up to approximately 20,380 +/- L.F. of 20” HDPE water line, 1,220 +/- L.F. of 16” DI water line, bore crossings, valves, air release valves, connection to systems and all necessary appurtenances in Calera, Alabama 35040.

Water Mark Logo

City of Aliceville Water and Sewer Board DWSRF Snoddy Well No. 2

Construction of a 1100 gpm backup production well, Snoddy Well No.2, at the site of existing Snoddy Well No.1 for increased supply capability and resiliency. Project activities also include the construction of a well canopy cover, configuration of piping, valves, and connections to the site’s existing treatment building, and electrical service upgrades to include all site improvement items as shown in the plans and specifications.

Water Mark Logo

Town of Carrollton Sewer System Upgrades Project

Identify and eliminate sources of infiltration and inflow within Carrollton’s wastewater collection system via video inspection, cleaning, de-rooting, installing cured-in-place pipe, cured-in-place manhole liners, manhole risers, and performing other sanitary sewer repairs.

Water Mark Logo

Town of Carrollton Sewer Line Repairs Project

Identify and eliminate sources of infiltration and inflow within Carrollton’s wastewater collection system via video inspection, cleaning, de-rooting, installing cured-in-place pipe, cured-in-place manhole liners, manhole risers, and performing other sanitary sewer repairs.

Water Mark Logo

Morris Fire Station Expansion

The expansion will include footings, concrete slab, building construction, and misc. other items as required to expand the current fire station.

Water Mark Logo

Alabaster WWTP Flood Remediation

Construction of new electrical platforms at the WWTP sludge building, and filter buildings, electrical, erosion control, and all associated appurtenances necessary to successfully complete the project at the wastewater treatment plant located in the City of Alabaster, Alabama.

Water Mark Logo

BURWELL ROAD WWTP IMPROVEMENTS

Installation of a headworks unit, MBR replacements, blowers, piping, valves, pumps, etc. at the Burwell WWTP, and all associated appurtenances.